/
Disable update of punching-load data
Disable update of punching-load data
How do I disable the “updating program calculated punching load data” function such that my model does not take a long time to update?
Answer: This message and update process occurs when the model has punching-load joint assignments. To resolve, export the model as an .s2k text file, delete the table for joint punching-load assignments, then import the .s2k file back into the software.
These assignments are only used for design according to API RP2A-WSD2000 or API RP2A-LRFD 97 codes. Unless you are using either of these, the removal of punching-load joint assignments will not affect analysis or design results.
, multiple selections available,
Related content
Create and copy load combinations
Create and copy load combinations
More like this
Influence-based moving-load analysis first steps (SAP2000)
Influence-based moving-load analysis first steps (SAP2000)
More like this
Step-by-step moving-load analysis first steps (SAP2000)
Step-by-step moving-load analysis first steps (SAP2000)
More like this
Acceleration load in arbitrary direction
Acceleration load in arbitrary direction
More like this
Time-history analysis first steps
Time-history analysis first steps
More like this
Punching shear
Punching shear
More like this