Overlapping punching-shear perimeters
What should I do when punching-shear perimeters overlap?
Answer: ACI 318 does not provide clear requirements as to how to deal with overlapping punching-shear perimeters. However, this uncommon case may be modeled within SAFE as follows:
- Model only one column as you would following a hand-calculation approach.
- Use statics to replace the loading within both columns with equivalent loads and moments located at the centroid of the composite section.
- SAFE will then check the punching-shear perimeter of the total composite section. Here, results will align with general practice.
NOTE: Punching-shear overwrites are available such that the perimeter may be manually input according to requirements.
See Also
- Verification examples of punching-shear calculations per various building codes are available within SAFE through Help > Documentation.