Unknown macro: {live-template}
The material presented in this page has been used for training for Mississippi Department of Transportation and has been provided by the courtesy of Harry A Cole, PhD, PE.
Unknown macro: {on-this-page}
Overview
The zipped attached file contains the following 3 PowerPoint files with the examples of 2-span PCC girder bridge with three different foundation types:
- Example2-Two-Equal-Spans-Option1-Final.ppt - Bent columns supported by "fixed" column base
- Example2-Two-Equal-Spans-Option2-Final.ppt - Replace "fixed" column base with pile/cap foundation, extending column to solid-element grid at mid-depth of pile cap.
- Example2-Two-Equal-Spans-Option3-Final.ppt - Pile/cap foundation, with bent column extending only to top of pile cap, with "Joint Constraint" (in place of "Weld" ) connecting base of column to solid-element grid at mid-depth of pile cap.
Attachments
- Zipped PowerPoint presentations (23 MB)
Unknown macro: {hidden-content}
Related Incidents:
- Unknown macro: {incident}