On this page:


Overview

The purpose of this model is to illustrate how to set up staged construction for a two-span precast girder bridge that is simply supported for dead loads and continuous for live loads. Since the main focus is on setting up the staged construction load case, no tendons have been added to the model for simplicity.


Figure 1: Deflection of the structure under self-weight

Model description

Key steps for setting up the model

Modeling comments

Discussion of results


Figure 2: Moment diagram at the end of staged construction (simply supported superstructure)


Figure 3: Live load moment diagram (continuous superstructure)


Important Comments:

As of SAP2000 V14.1.0., forces for each stage are reported to the centroid of the full bridge deck section. You may need to transform the forces to the centroid of the section that is active when the forces are applied. See /wiki/spaces/kb/pages/2002326 for additional information. TODO: to be reviewed in the latest version.

Attachments