Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 15 Next »

Unknown macro: {live-template}

The material presented in this page has been used for training for Mississippi Department of Transportation and has been provided by the courtesy of Harry A Cole, PhD, PE.

Unknown macro: {on-this-page}

Overview

The zipped attached file contains the following 3 PowerPoint files with the examples of 2-span PCC girder bridge with three different foundation types:

  • Example2-Two-Equal-Spans-Option1-Final.ppt - Bent columns supported by "fixed" column base
  • Example2-Two-Equal-Spans-Option2-Final.ppt - Replace "fixed" column base with pile/cap foundation, extending column to solid-element grid at mid-depth of pile cap.
  • Example2-Two-Equal-Spans-Option3-Final.ppt - Pile/cap foundation, with bent column extending only to top of pile cap, with "Joint Constraint" (in place of "Weld" ) connecting base of column to solid-element grid at mid-depth of pile cap.

Attachments

  • [Zipped PowerPoint presentations|^modeling bridge foundation - powerpoint presentations.zip] (23 MB)
Unknown macro: {hidden-content}

Related Incidents:

  • Unknown macro: {incident}
  • No labels