- The model should be revised to use the same maximum submesh size as is the discretization for the deck to avoid disconnected points.
- Revise the model to the latest version of SAP2000.
- Provide a discussion for interpreting the deck deflections due to weight of wet concrete.
Model screenshot
Unable to render embedded object: File (Staged_construction_for_precast_girder_bridge.png) not found.
Figure 1 - Deflected configuration
Approach 1 - Using section modifiers (Model B)
Key modeling steps
- Use the BrIM template to create a 2-span precast-girder bridge. Designate double bearings at the interior pier.
- Manually define 15 continuity links at the interior pier to connect the girders and deck between span 1 and span 2.
- Create three groups for the construction stage analysis of continuity links, deck, and all other objects.
- Use the Define > Named Property Sets > Area Modifiers command to define property modifiers for the deck shell elements. This will simulate the hardening of concrete.
- Set up construction stage analysis with separate stages to:
- add and load girders;
- add deck shell elements;
- reduce the stiffness of deck shell elements to simulate concrete placement;
- apply the deck dead load;
- reset the stiffness of the deck shell elements to simulate the hardening of concrete; and
- add continuity links to the model.
- add and load girders;
- Save the results at the end of each stage.
- Define moving-load analysis, starting from the end of staged-construction analysis.
Modeling comments
- The bridge has fixed bearings at the bent which restrain vertical, longitudinal, and transverse translation. Sliding bearings at the abutments restrain vertical and transverse translation. For all other bearing DOF, it is necessary to add small stiffness to stabilize the girder before the deck is erected, otherwise stability problems may occur.
Results
- Check bridge forces and stresses for each step of the staged construction analysis to ensure that moments are as expected for a simply-supported condition.
- Check moments for the results of moving-load analysis to ensure that moments are as expected for a continuous-girder system.
Additional screen shots
The moment diagram upon completion of staged construction, after all loads are applied to simply-supported beams elements, is shown in Figure 2:
Unable to render embedded object: File (Moment_at_the_end_of_staged_construction_(simply_supported).png) not found.
Figure 2 - Moment diagram at the end of staged construction
Moment induced by live load, applied to a continuous span, is shown in Figure 3:
Unable to render embedded object: File (Moment_for_live_load_(continuous).png) not found.
Figure 3 - Live load moment diagram
Important Comments:
As of V14.1.0., forces for each stage are reported to the centroid of the full bridge deck section. You may need to transform the forces to the centroid of the section that is active when the forces are applied. See bridge modeler forces and stresses diagrams for additional information.
Approach 2 - Change section properties (Model C)
Key modeling steps
- Use the Quick Bridge template to create a 2-span precast-girder bridge with double bearings at the interior pier.
- Manually define 15 continuity links at the interior pier to connect the girders and deck between span 1 and span 2.
- Create three groups for the construction stage analysis of continuity links, deck, and all other objects.
- Set up construction stage analysis with separate stages to:
- add and load the girders;
- add deck shell elements;
- reduce the stiffness of the deck shell elements to simulate concrete placement;
- apply the deck dead load;
- reset the stiffness of the deck shell elements to simulate the hardening of concrete; and
- add continuity links to the model.
- add and load the girders;
Attachments
- [SAP2000 file, Model B |Staged construction analysis of two-span precast girder bridge^SAP2000 V12.0.2 model B.zip] (zipped SDB file)
To do: Show powerpoint presentation with screenshots for model B.