The material presented on page, courtesy of Harry A Cole, Ph.D., P.E., serves the Mississippi Department of Transportation for training purposes. |
Overview
The zipped file attached contains three PowerPoint presentations which outline the modeling process for a 2-span PCC-girder bridge with three different foundation types. Presentation topics include the following:
Bent columns supported by a fixed column base (Example2-Two-Equal-Spans-
...
Option1-Final.ppt
...
)
Fixed column base replaced with pile/cap
...
foundation,
...
extending
...
column
...
to
...
solid-element
...
grid
...
at
...
mid-depth
...
of
...
pile
...
cap
...
(Example2-Two-Equal-Spans-
...
Option2-Final.ppt
...
)
Pile/cap
...
foundation
...
with
...
bent
...
column
...
extending
...
only
...
to
...
the top
...
of
...
pile
...
cap,
...
and Joint
...
Constraint
...
, in
...
place
...
of
...
Weld, connecting base of column to solid-element
...
grid
...
at
...
mid-depth
...
of
...
pile
...
cap (Example2-Two-Equal-Spans-Option3-Final.ppt)
Attachments
Power Point presentation (23MB)
Metadata
Name: Manual modeling of bridge foundations
Description: PowerPoint presentations are attached which provide detailed examples of a 2-span PCC-girder bridge with three different foundation types. A step-by-step modeling procedure, with detailed descriptions and sketches, outlines the process.
Program: CSiBridge
Program Version: 15.1.1+
Model ID: na