Users

...

have

...

control

...

over

...

when

...

joints

...

begin

...

to

...

deflect

...

during

...

staged-construction

...

analysis.

...

Constrained

...

joints

...

may

...

be

...

added

...

to

...

any

...

construction

...

stage,

...

and

...

may

...

begin

...

to

...

deflect

...

before

...

their

...

interconnecting

...

objects

...

are

...

added

...

to

...

the

...

structure.

...

Show if
groupeditors

Related Incidents:

  • Incident 17821: Handling of constrained joints in staged construction - change of behavior for SAP2000 V14.2.0.
} {related-incident:no=24340|comment=Using beam constraint to connect piles with integral abutment in a staged construction load case.} {hidden-content} The handling of [constrained joints|constraint] in [staged construction] has been changed in SAP2000
  • Incident 24340: Using beam constraint to connect piles with integral abutment in a staged construction load case.

Note: The handling of constrained joints in staged construction has been changed in SAP2000 V14.2.0

under

Incident

17821.

Previously

all

constrained

joints

deflected

with

the

master

joint

as

soon

as

any

joint

in

a

given

constraint

was

present

in

the

structure.

Now

the

deflections

of

a

constrained

joint

will

not

be

updated

until

that

joint

has

been

added

to

the

structure.

The

user

can

control

when

the

joints

begin

to

deflect

by

adding

constrained

joints

at

any

stage,

even

before

any

connected

elements

are

added.