{live-template:Tutorial} {info} The material presented in this page has been used for training for Miss. Dept. of Trans. and has been provided by the courtesy of Harry A Cole, PhD, PE. {info} {on-this-page} h1. Overview The zipped attached file contains the following 3 PowerPoint files with the examples of 2-span PCC girder bridge with three different foundation types: * Example2-Two-Equal-Spans-Option1-Final.ppt - Bent columns supported by "fixed" column base *
Wiki Markup
Info

The material presented on page, courtesy of Harry A Cole, Ph.D., P.E., serves the Mississippi Department of Transportation for training purposes.

Overview

The zipped file attached contains three PowerPoint presentations which outline the modeling process for a 2-span PCC-girder bridge with three different foundation types. Presentation topics include the following:

  1. Bent columns supported by a fixed column base (Example2-Two-Equal-Spans-

...

  1. Option1-Final.ppt

...

  1. )

  2. Fixed column base replaced with pile/cap

...

  1. foundation,

...

  1. extending

...

  1. column

...

  1. to

...

  1. solid-element

...

  1. grid

...

  1. at

...

  1. mid-depth

...

  1. of

...

  1. pile

...

  1. cap

...

  1. (Example2-Two-Equal-Spans-

...

  1. Option2-Final.ppt

...

  1. )

  2. Pile/cap

...

  1. foundation

...

  1. with

...

  1. bent

...

  1. column

...

  1. extending

...

  1. only

...

  1. to

...

  1. the top

...

  1. of

...

  1. pile

...

  1. cap,

...

  1. and Joint

...

  1. Constraint

...

  1. , in

...

  1. place

...

  1. of

...

  1. Weld, connecting base of column to solid-element

...

  1. grid

...

  1. at

...

  1. mid-depth

...

  1. of

...

  1. pile

...

  1. cap (Example2-Two-Equal-Spans-Option3-Final.ppt)

Attachments

Metadata

  • Name: Manual modeling of bridge foundations

  • Description: PowerPoint presentations are attached which provide detailed examples of a 2-span PCC-girder bridge with three different foundation types. A step-by-step modeling procedure, with detailed descriptions and sketches, outlines the process.

  • Program: CSiBridge

  • Program Version: 15.1.1+

  • Model ID: na

Show if
groupeditors

Related Incidents: