In the B31.4 Occasional Stress summary table, right-click the top of the Combined DCR column to sort largest to smallest. Sorting the B31.4 combined stress demand-capacity ratio (DCR) quickly finds the highest combined code stress. In this example, the highest combined stress ratio is just under 66%. As the results stress summary table makes clear, CSiPlant checks code stresses for each individual time step at 9 stations (default) along the length of each pipe, not just at meshed joint locations. 

...