Wiki Markup |
---|
{live-template:Tutorial}
{info}
The material presented in this page has been used for training for Mississippi Department of Transportation and has been provided by the courtesy of Harry A Cole, PhD, PE.
{info}
{on-this-page}
h1. Overview
The zipped attached file contains the following 3 PowerPoint files with the examples of 2-span PCC girder bridge with three different foundation types:
* Example2-Two-Equal-Spans-Option1-Final.ppt - Bent columns supported by "fixed" column base
* Example2-Two-Equal-Spans-Option2-Final.ppt - Replace "fixed" column base with pile/cap foundation, extending column to solid-element grid at mid-depth of pile cap.
* Example2-Two-Equal-Spans-Option3-Final.ppt - Pile/cap foundation, with bent column extending only to top of pile cap, with "Joint Constraint" (in place of "Weld" ) connecting base of column to solid-element grid at mid-depth of pile cap.
h1. Attachments
* [Zipped PowerPoint presentations|^modeling bridge foundation - powerpoint presentations.zip] (23 MB)
{hidden-content}
Related Incidents:
* {incident:no=41103|comment=Manually modeling bridge foundation}
{hidden-content} |
Page Comparison
Manage space
Manage content
Integrations